Palazzo Phase 1 – Las Vegas, NV
  • Indirectly for Taylor International
  • Installation of 26 Stainless Steel Pools & Spas manufactured by Bradford Products. WFX scope included leveling slabs, stainless steel vessels, onsite welding, supervision and management. Completed Spring of 2008.

Canyon Ranch Day Spa @ The Venetian
  • Venetian Hotel and Casino
  • Design-Build Installation of 2 spas within the Canyon Ranch Day Spa. WFX scope included the complete drawings and hydraulic calculations for the spas, leveling slabs, equipment, supervision and management. Completed Summer of 2008.

Hachi Restaurant Fountain @ Red Rock Resort and Casino
  • Penta Building Group
  • Installation of a water feature located at the Hachi Restaurant in the Red Rock Resort. The stainless steel basin was fabricated by Bradford Products. WFX scope included the installation of the stainless steel basins, plumbing and equipment, electrical and equipment, supervision and management. Completed Summer of 2007

Streamline Towers
  • Martin Harris Construction
  • Design-Build Installation of one pool and one spa on the rooftop of Streamline Towers. The stainless steel pool and spa were manufactured by Bradford Products. WFX scope included complete design drawings and hydraulic calculations, installation of the stainless steel vessels, leveling slabs, plumbing and equipment, electrical and equipment, tile, coping, supervision and management. Completed Spring of 2008.

Red Rock Resort Pool Deck Expansion Phase II
  • Tracy & Ryder Landscaping
  • Design-Build Construction of 3 shotcrete pools at the Red Rock Resort & Casino in Las Vegas, NV. WFX scope included complete design drawings and hydraulic calculations, excavation, reinforcing steel, plumbing and equipment, electrical and equipment, shotcrete, plaster, tile, supervision and management. Also included was the refurbishment of existing pools and spas including the pool at the Cherry Night Club. Completed Summer of 2007.

Turnberry Towers – East and West
  • Turnberry West Construction
  • Design-Build Construction of 2 shotcrete pools and 2 shotcrete spas. Both pools measure approximately 3,700 sq ft and are accented with waterfalls. Water FX scope included complete design drawings and hydraulic calculations, excavation, reinforcing steel, electrical and equipment, shotcrete, plaster, tile, supervision and management. Both projects completed in 2007.

Rhodes Ranch Recreation Center
  • Rhodes Homes
  • Design-Build Construction of multiple pools, spas, water & fire features. The highlight of the project was a 12,000 sq ft main pool accented by 5 fire bowls with sheer descents. A 5,000 sq ft lap pool and 3 spas were also constructed. WFX also teamed with Whitewater to install a large childrens water play structure. WFX scope included excavation, reinforcing steel, plumbing and equipment, electrical and equipment, shotcrete, plaster, tile, supervision and management. Completed in Spring 2007

Tuscany Recreation Center
  • Rhodes Homes
  • Design-Build Construction of multiple pools, spas, water & fire features. The highlight of the project was a 9,000 sq ft main pool accented by fire. Also constructed was a 3,000 sq ft lap pool and 2 spas. WFX scope included excavation, reinforcing steel, plumbing and equipment, electrical and equipment, shotcrete, plaster, tile, supervision and management. Completed in Summer 2007

Palms Pool Expansion – The Palms Hotel and Casino
  • Indirectly for Whiting-Turner
  • Constructed two shotcrete pools, both approximately 5,000 sq ft and two spas. The activity pool is a gutter style pool. Check out the portfolio for some amazing photos. WFX scope inluded excavation, forming, reinforcing steel,lighting, shotcrete, tile, supervision and management. Completed in April 2006

Tahiti Village Phase 1
  • Martin Harris Construction
  • Design-Build Construction of a 10,000 sq ft shotcrete pool with a sandy beach entry, a large spa, artificial rock waterfall with Site Development Studios and a water feature. See the portfolio for great pictures. Water FX scope included complete design drawings and hydraulic calculations, excavation, plumbing and and equipment, electrical and equipment, reinforcing steel, shotcrete, plaster, tile, supervision and management. Completed in October 2006

Brazilian Restaurant Fire Wall – Imperial Palace – Biloxi, MS
  • KHS&S
  • Designed and installed a 100'+ fire wall inside the Brazilian restaurant at the Imperial Palace located in Biloxi, MS. See the portfolio for photos. Completed August 2006.